On the third day, I was 10 minutes late for
work, I got stuck in traffic, when a Balinese funeral was happening in front of
the WaterBom. Some of the staff were late, too, due to the funeral. I met up
with Sayan (manager), he said I would be doing two things today, I would be an
Engineer and would be working in the head office doing sales. I was astonished
to hear that I would be doing two things in one day. I started off as an
engineer and met up with head engineer “Putra”, he was a funny guy to be with.
Putra then introduced me to the other engineers. Today until 12 o’clock I would
be working with him. Putra gave me a tour of where he goes, we went everywhere.
Putra also showed me what he does, like checking the water pumps. WaterBom has
a total of 16 water pumps, 12 for the slides in the towers and Lazy river. The
other 4 belong to the new rides like Boomerang, SuperBowl and the Climax. Every
hour, Putra and I had to check the chlorine levels at each pool, we had to
check, if it’s ideal or not. We did that until 12 o’clock, once it was 12
o’clock, we have finished and headed straight for our lunch break. For Lunch we had Babi guling and lawar, it
was delicious. After Lunch I met with the Sales executive “ Pande”, he too was
a nice guy. What we had to do, was to
deliver the brochures and flyers to hotels, and travel agencies in Centro and
near Kuta. We did this util 3pm, this was a tiring job, too, because you have
to go places and negotiate with people. Negotiating can take at least an hour.
I didn’t find being a sales executive very exciting. At 3pm, I ran into Sayan and he said I could go
home early today, I was so happy and relieved!
On the 4th day I woke up late,
due to the exhausting day I had yesterday. I had no energy in me, I was
hoping that I wouldn’t do any boring
jobs at work experience. Amazingly my hopes were heard, and got me a job that I
have been waiting for. The job that I was doing today, was Marketing and
Graphic Design! I met the head leader of the marketing team, her name was Rani.
She is really funny and full of energy! She then introduced me to marketing,
she explained the jobs I had to do. The main job that I had to do, was to make
sure that all of the WaterBom website is up to date. The other task that I had
to do, was to make sure that I replied to the WaterBom fans on Facebook and
Twitter. WaterBom has over 1000 fans on Facebook and Twitter, and it was my job
to reply to them. At 1pm was my lunch
break, I had lunch with the graphic design team, they too are really fun to
hang out with. After lunch I got a surprise from Mr. Mark! I had no idea that he
would come to WaterBom! I explained what I did the past few days and gave him a
tour at the office. After Mark left, I
went to the Graphic Design team. Their names were Ari and Made, they showed me
what they do. I helped them by putting all of their work on Facebook, Twitter
and the WaterBom website! I left work around 4.30pm and this too was another
great day!
I have read your first blog also in which you had told us your work expereince. I was anxiosuly waiting for part 2 and here it is. Great job
ReplyDeleteThank you for sharing your experience with us. Updating company’s website isn’t the easy work. You need to have complete knowledge about your company while answer the fans on Facebook and twitter.
ReplyDelete